Off-world Power Generation Components: Difference between revisions
No edit summary |
No edit summary |
||
Line 8: | Line 8: | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
! style="background:# | ! style="background:#d8e0ea; color:#113333" | Description | ||
! style="background:# | ! style="background:#d8e0ea; color:#113333" | Reference implementation | ||
! style="background:# | ! style="background:#d8e0ea; color:#113333" colspan=2 | Efficiency | ||
! style="background:# | ! style="background:#d8e0ea; color:#113333" colspan=2 | Cost | ||
|- | |- | ||
| Off-world solar collection | | Off-world solar collection | ||
| [[Off-world Power Generation Lab 1: Free Space 1W Transmission|Lab 1]] | | [[Off-world Power Generation Lab 1: Free Space 1W Transmission|Lab 1]] | ||
| style="text-align:right;;border-right:0px;" | | | style="text-align:right;;border-right:0px;" | 0.0000 (tbd) | ||
| style="border-left:0px;" | W/kg | | style="border-left:0px;" | W/kg | ||
| style="text-align:right;border-right:0px;" | | | style="text-align:right;border-right:0px;" | (tbd) 0.0 | ||
| style="border-left:0px;" | $/W | | style="border-left:0px;" | $/W | ||
|- | |- | ||
|Off-world solar | | Off-world solar storage | ||
|[[Off-world Power Generation Lab 1: Free Space 1W Transmission|Lab | | [[Off-world Power Generation Lab 1: Free Space 1W Transmission|Lab 2]] | ||
| | | style="text-align:right;;border-right:0px;" | 0.0000 (tbd) | ||
| | | style="border-left:0px;" | Wh/kg | ||
| | | style="text-align:right;border-right:0px;" | (tbd) 0.0 | ||
|$/ | | style="border-left:0px;" | $/Wh | ||
|- | |- | ||
| | | Off-world solar transmission | ||
| Requirements | |||
Requirements | |||
* Transmission/receiver handshake | * Transmission/receiver handshake | ||
** for precision aiming | ** for precision aiming | ||
** for safety; power laser cutoff within 5 seconds when transmission line of sight is blocked | ** for safety; power laser cutoff within 5 seconds when transmission line of sight is blocked | ||
* Cyber-security best practices | * Cyber-security best practices | ||
[[Off-world Power Generation Lab 1: Free Space 1W Transmission|Lab 3]] | |||
| style="text-align:right;;border-right:0px;" | 0.0000 (tbd) | |||
| style="border-left:0px;" | Wh % | |||
| style="text-align:right;border-right:0px;" | (tbd) 0.0 | |||
| style="border-left:0px;" | $/Wh | |||
|- | |||
| Earthbound solar collection | |||
| [[Off-world Power Generation Lab 1: Free Space 1W Transmission|Lab 2]] | |||
| style="text-align:right;;border-right:0px;" | 0.0000 (tbd) | |||
| style="border-left:0px;" | Wh % | |||
| style="text-align:right;border-right:0px;" | (tbd) 0.0 | |||
| style="border-left:0px;" | $/Wh | |||
|- | |||
= | | Launch off-world gear | ||
| [[Off-world Power Generation Lab 1: Free Space 1W Transmission|Lab 2]] | |||
| style="text-align:right;;border-right:0px;" | | |||
| style="border-left:0px;" | | |||
| style="text-align:right;border-right:0px;" | (tbd) 0.0 | |||
| style="border-left:0px;" | $/kg | |||
|- | |||
| Robotic self-assembly of off-world gear | |||
| Requirements | |||
Requirements | |||
* Establishment of orbit and assembly of initial gear | * Establishment of orbit and assembly of initial gear | ||
* Orbital delivery and assembly of supplemental gear | * Orbital delivery and assembly of supplemental gear | ||
[[Off-world Power Generation Lab 1: Free Space 1W Transmission|Lab 6]] | |||
| style="text-align:right;;border-right:0px;" | | |||
| style="border-left:0px;" | | |||
| style="text-align:right;border-right:0px;" | (tbd) 0.0 | |||
| style="border-left:0px;" | $/kg | |||
|- | |||
|} |
Revision as of 20:22, 15 December 2018
Each component will have a reference implementation with a black box efficiency and cost rating.
- Any efficiency improvement of at least 2% with no more than a 10% cost increase will automatically qualify to be the new reference standard.
- Any cost reduction of at least 0.5% with no loss in efficiency will automatically qualify to be the new reference standard.
- Higher-cost efficiency improvements will be accepted for review by the board, who will consider the cost impact on the success of the project.
- Lower-cost improvements that result in a "statistically insignificant" efficiency loss will be accepted for review by the board.
Description | Reference implementation | Efficiency | Cost | ||
---|---|---|---|---|---|
Off-world solar collection | Lab 1 | 0.0000 (tbd) | W/kg | (tbd) 0.0 | $/W |
Off-world solar storage | Lab 2 | 0.0000 (tbd) | Wh/kg | (tbd) 0.0 | $/Wh |
Off-world solar transmission | Requirements
|
0.0000 (tbd) | Wh % | (tbd) 0.0 | $/Wh |
Earthbound solar collection | Lab 2 | 0.0000 (tbd) | Wh % | (tbd) 0.0 | $/Wh |
Launch off-world gear | Lab 2 | (tbd) 0.0 | $/kg | ||
Robotic self-assembly of off-world gear | Requirements
|
(tbd) 0.0 | $/kg |