Off-world Power Generation Components: Difference between revisions
No edit summary |
No edit summary |
||
Line 31: | Line 31: | ||
* Transmission/receiver handshake | * Transmission/receiver handshake | ||
** for precision aiming | ** for precision aiming | ||
** for safety | ** for safety, with instant power laser cutoff when interrupted | ||
* Cyber-security best practices | * Cyber-security best practices | ||
| [[Off-world Power Generation Lab 1: Free Space 1W Transmission|Lab 3]] | | [[Off-world Power Generation Lab 1: Free Space 1W Transmission|Lab 3]] |
Revision as of 20:36, 15 December 2018
Each component will have a reference implementation with a black box efficiency and cost rating. Reference implementations will be subject to constant improvement, with new contributions welcome from any interested party at any time. Contributions must be well-documented and repeatable.
- Any efficiency improvement of at least 2% with no more than a 10% cost increase will automatically qualify to be the new reference standard.
- Any cost reduction of at least 0.5% with no loss in efficiency will automatically qualify to be the new reference standard.
- Higher-cost efficiency improvements will be accepted for review by the board, who will consider the cost impact on the success of the project.
- Lower-cost improvements that result in a "statistically insignificant" efficiency loss will be accepted for review by the board.
Description | Reference implementation | Efficiency | Cost | ||
---|---|---|---|---|---|
Off-world solar collection | Lab 1 | TBD | W/kg | TBD | $/W |
Off-world solar storage | Lab 2 | TBD | Wh/kg | TBD | $/Wh |
Off-world solar transmission
|
Lab 3 | TBD | Wh % | TBD | $/Wh |
Earthbound solar collection | Lab 2 | TBD | Wh % | TBD | $/Wh |
Launch off-world gear | Lab 2 | N/A | TBD | $/kg | |
Robotic self-assembly of off-world gear
|
Lab 6 | N/A | TBD | $/kg |