Off-world Power Generation Components: Difference between revisions
No edit summary |
|||
Line 4: | Line 4: | ||
* Higher-cost efficiency improvements will be accepted for review by the board, who will consider the cost impact on the success of the project. | * Higher-cost efficiency improvements will be accepted for review by the board, who will consider the cost impact on the success of the project. | ||
* Lower-cost improvements that result in a "statistically insignificant" efficiency loss will be accepted for review by the board. | * Lower-cost improvements that result in a "statistically insignificant" efficiency loss will be accepted for review by the board. | ||
{| style="background:#EEEEEE" border="1" cellpadding="2" | |||
|- | |||
|[[Image:GoogleResultsWalker_small.jpg|50px|left]] Off-world solar collection | |||
|Reference implementation: [[Off-world Power Generation Lab 1: Free Space 1W Transmission|Lab 1]] | |||
|Efficiency (W/kg): TBD | |||
|Cost ($/W): TBD | |||
|- | |||
|[[Image:Boxcarkid_thumb.png|50px|left]] [http://boxcarkid.com The Boxcar Kid] | |||
|The website for my dad's historic novel, The Boxcar Kid. It includes a blog that he posts to regularly, don't miss it. | |||
|- | |||
|} | |||
Line 46: | Line 60: | ||
* Efficiency (Wh*km): TBD | * Efficiency (Wh*km): TBD | ||
* Cost ($/Wh*km): TBD | * Cost ($/Wh*km): TBD | ||
=== Launch of off-world gear === | |||
Reference implementation | |||
* Description: TBD | |||
* Efficiency (Wh*km): TBD | |||
* Cost ($/Wh*km): TBD | |||
=== Robotic self-assembly of off-world gear === | |||
Requirements | |||
* Establishment of orbit and assembly of initial gear | |||
* Orbital delivery and assembly of supplemental gear | |||
Reference implementation | |||
* Description: TBD | |||
* Cost ($/kg): TBD |
Revision as of 19:50, 15 December 2018
Each component will have a reference implementation with a black box efficiency and cost rating.
- Any efficiency improvement of at least 2% with no more than a 10% cost increase will automatically qualify to be the new reference standard.
- Any cost reduction of at least 0.5% with no loss in efficiency will automatically qualify to be the new reference standard.
- Higher-cost efficiency improvements will be accepted for review by the board, who will consider the cost impact on the success of the project.
- Lower-cost improvements that result in a "statistically insignificant" efficiency loss will be accepted for review by the board.
Off-world solar collection | Reference implementation: Lab 1 | Efficiency (W/kg): TBD | Cost ($/W): TBD |
The Boxcar Kid | The website for my dad's historic novel, The Boxcar Kid. It includes a blog that he posts to regularly, don't miss it. |
Off-world solar collection
Reference implementation
- Description: TBD
- Efficiency (W/kg): TBD
- Cost ($/W): TBD
Off-world solar storage
Reference implementation
- Description: TBD
- Efficiency (Wh/kg): TBD
- Cost ($/Wh): TBD
Off-world solar transmission
Requirements
- Transmission/receiver handshake
- for precision aiming
- for safety; power laser cutoff within 5 seconds when transmission line of sight is blocked
- Cyber-security best practices
Reference implementation
- Description: TBD
- Efficiency (Wh %): TBD
- Cost ($/Wh): TBD
Earthbound solar collection
Reference implementation
- Description: TBD
- Efficiency (Wh %): TBD
- Cost ($/Wh): TBD
Earthbound solar distribution
Reference implementation
- Description: TBD
- Efficiency (Wh*km): TBD
- Cost ($/Wh*km): TBD
Launch of off-world gear
Reference implementation
- Description: TBD
- Efficiency (Wh*km): TBD
- Cost ($/Wh*km): TBD
Robotic self-assembly of off-world gear
Requirements
- Establishment of orbit and assembly of initial gear
- Orbital delivery and assembly of supplemental gear
Reference implementation
- Description: TBD
- Cost ($/kg): TBD