Off-world Power Generation Components
Each component will have a reference implementation with a black box efficiency and cost rating. Reference implementations will be subject to constant improvement, with new contributions welcome from any interested party at any time. Contributions must be well-documented and repeatable.
- Any efficiency improvement of at least 2% with no more than a 10% cost increase will automatically qualify to be the new reference standard.
- Any cost reduction of at least 0.5% with no loss in efficiency will automatically qualify to be the new reference standard.
- Higher-cost efficiency improvements will be accepted for review by the board, who will consider the cost impact on the success of the project.
- Lower-cost improvements that result in a "statistically insignificant" efficiency loss will be accepted for review by the board.
- Cross-component concerns (eg, amount of storage capability required) will be considered by the board as needed.
- Requirements are subject to change by the board at any time as needed.
Description | Requirements | Reference implementation | Efficiency | Cost | ||
---|---|---|---|---|---|---|
Off-world solar collection | Lab 1: Free Space 1W Transmission | TBD | W/kg | TBD | $/W | |
Off-world solar storage |
|
Lab 1: Free Space 1W Transmission | TBD | Wh/kg | TBD | $/Wh |
Off-world solar transmission |
|
Lab 2: Laser aiming | TBD | Wh % | TBD | $/Wh |
Earthbound solar collection |
|
Lab 2: Laser aiming | TBD | Wh % | TBD | $/Wh |
Launch off-world gear | TBD | - | TBD | $/kg | ||
Robotic self-assembly of off-world gear |
|
TBD | - | TBD | $/kg |